Checking your account

You can read the lesson while its saved answers and constructions load. Learning controls will open once that work is ready.

Simulating Physical Systems

Compare policies on the same simulated shifts

Coding challenges

BOTIE

Subtract candidate cost from baseline cost for each shared scenario, then calculate the mean.
Ready to test
0 passed · 0 failed · 2 not run

An empty floor. Start with the information your machine needs.

Received result

Your answer will arrive here.

Examples, experiments and workspace controls
Live values

Connect a tool's inputs to see what it produces. You can try a branch before connecting it to Result.

Try your own inputs

Use a copy of the example to try your own data. Keep the problem's assumptions in mind, and predict the effect of a change before checking the output. You can also add another branch to compare two ways of doing the calculation.

Start at an output arrow, then click or drag to an input. Drag empty space to pan. Delete removes a selection. Ctrl/Cmd+Z undoes a change.
Context for this challenge

Subtract candidate cost from baseline cost for each shared scenario, then calculate the mean.

An easier simulated shift made a candidate look better before its policy changed.

Subtract costs on aligned scenarios before taking a mean.

Examples and results
Baseline cost per scenario
  1. 010
  2. 120
  3. 230
Candidate cost for the same scenarios
  1. 08
  2. 118
  3. 228
Required result
2
Baseline cost per scenario
  1. 010
  2. 120
Candidate cost for the same scenarios
  1. 08
  2. 122
Required result
0
Try a fresh construction

This clears this draft, including its undo history. Earlier successful attempts stay recorded. Build again without opening hints to record an independent attempt.

Stuck? Inspect a worked construction

The tools below form one possible solution. You can assemble it, follow its signals, and undo that change to return to your own construction.

Assumptions and test precision

Costs are invented. Statistical uncertainty needs independent replications and physical transfer needs separate validation. Numerical tests allow a difference of 0.001. Lists and structures must also have the right shape.

A candidate loses on most of the new shifts

This check uses the pieces from “Pair the policy outcomes”.

BOTIE

The candidate reduces cost on one shift but raises it on two. Predict the mean gain and decide which individual changes you would inspect next.
Baseline cost per scenario
  1. 05
  2. 110
  3. 215
Candidate cost for the same scenarios
  1. 04
  2. 112
  3. 218

Use a number, text, or an array matching the requested result. A named result uses field names, such as {"count": 2}. For a matrix, put each row in brackets. Saving your prediction runs your current construction on these inputs and checks the earlier examples too.

Build a construction in the workspace above first. This case will test those pieces.

Which randomness can genuinely be shared when actions change the future?

State the coupling and reserve fresh scenarios for assessment.

Costs are invented. Statistical uncertainty needs independent replications and physical transfer needs separate validation.

Continue the courseLearn the Unknown Part of a Physical Model →
← The Simulator Invented an Oscillation