State Estimation and Tracking

Keep the timeline while a measurement is absent

Coding challenges

The first frame disappears

The previous construction used a camera number at every update. An obstruction now removes one reading, but the conveyor keeps moving. Botie needs to continue the prediction without inventing camera evidence.

BOTIE

Why would replacing the missing first camera reading with a measurement of 0 m change this estimate?
The inputs we are comparing

Initial mean/variance record

Same in both cases

mean
0
variance
1

First expected displacement in m

Same in both cases

1

First added motion variance in m²

Same in both cases

1

First measurement in m, or null

Both frames arrive

3

The first frame is absent

null

First measurement variance in m²

Same in both cases

1

Second expected displacement in m

Same in both cases

1

Second added motion variance in m²

Same in both cases

1

Second measurement in m, or null

Same in both cases

4

Second measurement variance in m²

Same in both cases

1
Result for both frames arrive
mean
3.75
variance
0.625
Choose an explanation to test
A longer reverse interval follows the missed frame

This check uses the pieces from “Give prediction and optional correction their own places”.

BOTIE

Start with mean 1 m and variance 0.5 m². The two displacements are -1 m and -2 m, with added variances 0.5 m² and 1 m². Only the final camera reading arrives: -1 m with variance 1 m². Predict the final mean and variance.
Initial mean/variance record
mean
1
variance
0.5
First expected displacement in m
-1
First added motion variance in m²
0.5
First measurement in m, or null
null
First measurement variance in m²
1
Second expected displacement in m
-2
Second added motion variance in m²
1
Second measurement in m, or null
-1
Second measurement variance in m²
1

Use a number, text, or an array matching the requested result. A named result uses field names, such as {"count": 2}. For a matrix, put each row in brackets. Saving your prediction runs your current construction on these inputs and checks the earlier examples too.

Build a construction in the workspace above first. This case will test those pieces.

What must change if an observation arrives out of timestamp order?

Represent unavailable evidence explicitly and keep the estimate’s time.

Two chronological scalar intervals with supplied uncertainty; no out-of-sequence update, real camera or physical actuation.